Free printable punch list & snag list template
A clean, no-nonsense template for recording defects on a site walk-round or a new build snagging inspection. Print it on A4, save it as a PDF, or open it in Excel or Google Sheets.
Punch list / snag list
Sheet ____ of ____
Project
Site address
Client / customer
Inspected by
Inspection date
Main contractor
Swipe sideways to see all eight columns, or print / download for the full sheet.
| No. | Location / room | Trade | Description | Priority | Date raised | Status | Sign-off |
|---|---|---|---|---|---|---|---|
| 1 | H / M / L | Open / Resolved | |||||
| 2 | H / M / L | Open / Resolved | |||||
| 3 | H / M / L | Open / Resolved | |||||
| 4 | H / M / L | Open / Resolved | |||||
| 5 | H / M / L | Open / Resolved | |||||
| 6 | H / M / L | Open / Resolved | |||||
| 7 | H / M / L | Open / Resolved | |||||
| 8 | H / M / L | Open / Resolved | |||||
| 9 | H / M / L | Open / Resolved | |||||
| 10 | H / M / L | Open / Resolved | |||||
| 11 | H / M / L | Open / Resolved | |||||
| 12 | H / M / L | Open / Resolved | |||||
| 13 | H / M / L | Open / Resolved | |||||
| 14 | H / M / L | Open / Resolved | |||||
| 15 | H / M / L | Open / Resolved |
Whether you call it a punch list (the usual term in the US) or a snag list (the usual term in the UK and Ireland), the job is the same: write down every defect and unfinished item before a building is handed over, make sure someone is responsible for each one, and check them off as they are put right. If you are new to the idea, our guide What is a punch list? covers the background.
This template gives you a consistent format for doing that. It is deliberately simple — one defect per row, eight columns — so it works equally well for a contractor walking a finished extension, a site manager running a pre-handover inspection, or a homeowner snagging a new build.
What each column is for
- No. — a unique number for every item. When someone says "number 12 is done", there is no confusion about which item they mean. Keep numbering going across sheets rather than restarting at 1.
- Location / room — where the defect is, as precisely as possible: "Kitchen, left of hob", "Bedroom 2, window reveal", "Plot 14, rear elevation".
- Trade — who needs to fix it: carpentry, plastering, decorating, electrical, plumbing, flooring, masonry, general. This is what lets you split one list into a job list for each trade.
- Description — what is wrong and, ideally, what "fixed" looks like.
- Priority — high for anything affecting safety, security, watertightness or whether the building can be handed over; medium for functional problems; low for cosmetic finishes.
- Date raised — when the item was recorded. Useful when you are chasing progress, and when a warranty or contract has time limits.
- Status — open or resolved. Only the person who raised the item (or the client) should mark it resolved, after re-inspecting it.
- Sign-off — initials and date once the fix has been checked. This is your record that the item was closed out properly.
How to use the template
- Fill in the header first. Project name, site address, client, who is inspecting and the date. Loose sheets get separated; the header stops them getting mixed up.
- Walk the building in a fixed route. Start at the front door (or the top floor) and work room by room in the same order every time. Check ceilings, walls, floors, then fixtures, so nothing is skipped. For a room-by-room prompt, use our new build snagging checklist; for a trade-by-trade one, use the construction punch list checklist.
- Record one defect per row. "Scuffs and a missing socket cover in the lounge" is two items, possibly for two different trades. Split them.
- Photograph every item. Write the item number on a sticky note or in the photo filename so pictures can be matched to rows later.
- Set a priority and hand it out. Send the list to the main contractor or builder, or give each trade the rows marked with their trade.
- Re-inspect, then sign off. When an item is reported fixed, check it yourself before marking it resolved and initialling the sign-off column.
Writing items people can act on
The single biggest difference between a punch list that gets cleared quickly and one that drags on for weeks is the quality of the descriptions. A good item tells the tradesperson where to go, what to look at, and when they are finished — without them having to phone you.
Avoid opinions ("shoddy finish") and stick to observations. They are quicker to agree on and much harder to dispute.
Using it in Excel or Google Sheets
If you would rather keep the list on a laptop, download the CSV version. It has the same eight columns, two example rows to show the level of detail to aim for, and numbered blank rows ready to fill in.
- Excel: open the file directly, then use File → Save As and choose Excel Workbook (.xlsx) so you can add formatting, filters and drop-down lists for priority and status.
- Google Sheets: choose File → Import → Upload, select the CSV, then share the sheet with your contractor so everyone is working from the same version.
- Tip: turn on a filter for the Trade column. Filtering to "Electrical", say, gives you an instant job list to send to the electrician.
Where paper and spreadsheets fall short
A template is a big improvement on notes scribbled on the back of a drawing, and for a small job it may be all you need. On larger jobs, though, the same problems come up again and again:
- Photos live somewhere else. Matching a camera roll to row numbers is slow and easy to get wrong, and a written description is rarely as clear as a picture with the problem circled.
- Typing up takes an evening. Handwritten sheets usually get re-typed before they are sent, which is where items get dropped.
- Versions multiply. Once a spreadsheet has been emailed back and forth a few times, nobody is sure which copy has the latest status.
- No offline photos in a shared sheet. Basements, new estates and plant rooms often have no signal, which makes cloud spreadsheets awkward on site.
A faster alternative: the same list, built as you walk
Punch Zero is a punch list and snag list app that does what this template does, with the slow parts taken out. Each defect is recorded with its photo attached, you can draw, circle or box the problem right on the image, and you can dictate the description by voice instead of typing. Every item has a trade category, an open/resolved status, and dates raised and resolved.
When you are done, one tap produces a PDF punch list report — filtered by trade if you like, with or without resolved items — ready to share by email or WhatsApp. It works without signal (photos save to your phone straight away and upload when you are back online), and the same projects are available in the web app on any computer.
Skip the paperwork
Turn your next walk-round into a PDF report in one tap
Photos, annotations, voice notes and trade categories on every item. Free for 7 days on Android or in your browser.
iOS coming soon. iPhone users can use the web app in Safari in the meantime.