A practical, trade-by-trade list of what to inspect before handover — so your punch walk is thorough, your snag list is short, and your trades know exactly what to fix.

Go to the checklist ↓

Updated 3 November 2026 · About 9 minutes to read

Every contractor knows the feeling: the job is "finished", the client is booked in for the walk-round, and you are about to find out how many small things were missed. A structured construction punch list — or snag list, if you work in the UK — is how you get ahead of that. Walk the job yourself first, with a checklist, and the client's list ends up short and predictable.

This checklist is organised by trade, because that is how punch list items get fixed: each item ends up on a particular subcontractor's job sheet. If you would rather work room by room, the same points apply; our new build snagging checklist is laid out that way. New to the terminology? Start with what is a punch list?

How to use this checklist

  • Walk areas as they finish, not just at the end. A pre-punch of each floor or unit before follow-on trades arrive is the cheapest punch list you will ever do.
  • Pick a route and stick to it. Room by room, top to bottom, with this list as your prompt for what to look at in each space.
  • Record one defect per item, tagged with the responsible trade, a precise location and a photo.
  • Adapt it. Every project has its own specification; add the items your contract or client cares about most.

The construction punch list checklist

General & structure

  • Work matches the current drawings and specification, including any agreed variations
  • No visible structural cracking, movement or deflection in walls, floors or ceilings
  • Fire stopping complete around service penetrations; fire doors and seals in place where specified
  • Access hatches, risers and service voids are closed, labelled and accessible
  • All areas cleaned: no debris, protective film, stickers or packaging left behind
  • Temporary protection, fixings and signage removed
  • Damage from other trades recorded and assigned

Carpentry & joinery

  • Skirtings, architraves and trims fixed tight to walls, with neat mitres and filled joints
  • No gaps between joinery and walls, floors or worktops beyond what will be sealed
  • Stairs, handrails and balustrades secure, with no movement or creaking
  • Built-in units, wardrobes and shelving level, plumb and fixed securely
  • Boxing-in and pipe casings removable where access is needed
  • No splits, dents or hammer marks in finished timber

Doors & ironmongery

  • Doors open and close freely without binding, with consistent gaps to frame and floor
  • Latches and locks engage without slamming or lifting the door
  • Hinges, handles and closers tight; closers adjusted so doors close fully but not violently
  • Door stops fitted where handles could hit walls
  • Keys supplied, labelled and tested for every lock; master-key suites work as scheduled
  • Seals, intumescent strips and vision panels fitted where specified

Windows & glazing

  • All opening lights operate, lock and restrict correctly
  • No scratched, chipped or misted units; safety glass marked where required
  • External and internal seals complete and neat; no visible gaps at frames
  • Window boards and reveals finished, level and sealed
  • Trickle vents, handles and restrictors fitted and working
  • Glass and frames cleaned, labels and protective film removed

Plastering & drylining

  • Walls and ceilings flat and true under raking light; no ripples, bulges or trowel marks
  • No cracks, nail or screw pops, or visible board joints
  • External corners straight with beads fully covered; internal corners crisp
  • Making good around sockets, switches, pipes and downlights completed
  • Ceilings level at junctions with bulkheads and walls

Decorating

  • Even coverage with no patches, misses, drips, runs or roller marks
  • Cutting-in straight at ceilings, skirtings and between colours
  • No paint on ironmongery, sockets, glass, flooring or sealant
  • Woodwork filled, sanded and finished smoothly; no brush hairs or grit in the finish
  • Colours and sheen match the specification in every room
  • Touch-ups blend in and don't show as patches in daylight

Flooring & tiling

  • Floor finishes level and flat, with no lippage between tiles
  • No cracked, chipped, hollow or loose tiles; grout lines even and fully filled
  • Movement joints provided where needed and kept clear of grout
  • Carpet, vinyl and timber fitted neatly at edges, with no lifting seams or bubbles
  • Threshold strips and transitions fitted, flush and secure
  • Wall tiling plumb, level and neatly cut around fittings; silicone where tiling meets fixtures

Electrical

  • Every socket, switch and fused spur works; faceplates level, tight and undamaged
  • All lighting circuits operate, including emergency, external and cupboard lights
  • Two-way and intermediate switching works from every position
  • Smoke, heat and carbon monoxide alarms installed and tested
  • Consumer unit labelled, with test certificates and schedules ready for handover
  • Data, TV and doorbell points installed where specified and working
  • Extract fans run, with overruns set where specified

Plumbing & heating

  • No leaks at joints, valves, traps or appliance connections after a run test
  • Hot and cold supplies correct at every outlet, with reasonable flow and temperature
  • Wastes drain freely; traps hold water and there are no odours
  • Radiators heat evenly, are bled, level and fixed securely; valves and caps fitted
  • Boiler, heat pump or cylinder commissioned, with controls set up and paperwork available
  • Isolation valves and stop taps accessible and labelled
  • Pipework clipped, insulated where required and free of knocking

Kitchens

  • Units level and aligned; doors and drawers adjusted with even gaps
  • Worktop joints tight and sealed; cut-outs sealed against moisture
  • Sink, taps and waste connected, sealed and leak-free
  • Appliances installed, working and matching the schedule; integrated doors aligned
  • Plinths, end panels, fillers and cornice fitted
  • Splashbacks and upstands complete and sealed

Bathrooms

  • Sanitaryware secure, undamaged and correctly sealed
  • Showers tested for leaks at screens, trays and wall junctions
  • Toilets flush, refill and shut off correctly; cisterns don't run on
  • Accessories (rails, roll holders, mirrors) fixed level and securely
  • Silicone continuous, neat and mould-resistant; no gaps behind basins
  • Ventilation working; no water marks on ceilings below

External works

  • Brickwork, render and cladding clean, consistent and undamaged; weep vents clear
  • Roof coverings, flashings, gutters and downpipes complete and discharging correctly
  • Paving, kerbs and driveways level, with correct falls away from the building
  • Drainage covers level, accessible and undamaged; gullies clear
  • Fences, gates, walls and boundaries complete and in the correct position
  • Landscaping, turf and planting completed as specified; rubble removed
  • External lighting, taps and meter boxes fitted and working

Running an efficient punch walk

  1. Agree who attends. The site manager, the client or their representative, and ideally the foremen of the trades most likely to pick up items.
  2. Prepare the area first. Lights working, rooms clean, protection removed. You can't punch what you can't see — and dust makes everything look worse.
  3. Record as you go. Write each item on the spot, with a photo. Lists reconstructed from memory at the end of the day are always shorter than the real thing.
  4. Agree items on the walk. If the client and contractor agree what is (and isn't) a defect while standing in front of it, there are far fewer disputes later.
  5. Issue the list the same day. Split it by trade so each subcontractor gets only their items.

Closing out the list

The punch list isn't finished when the items are fixed — it's finished when every fix has been checked and signed off. Set a date for re-inspection, walk only the open items, and mark each one resolved as you confirm it. Keep the record: dates raised and resolved, with before-and-after photos, are your evidence that the work was completed, and are useful if questions come up later during a defects or warranty period.

On smaller jobs, a printed sheet works fine — try our free punch list template. On anything with more than a handful of rooms or trades, an app saves hours.

Doing it in the Punch Zero app

Punch Zero is a construction punch list app built around this workflow. Set up a project with its reference and customer details, then log each defect as you walk: take a photo, mark it up with draw, circle and rectangle tools, dictate the note, and tag the trade — Flooring, Masonry, Carpentry, General, or whatever categories suit your work.

Mark items resolved as you check each fix, and the date raised and date resolved are kept on every item. When it is time to issue the list, generate a PDF punch list report in one tap, filtered by trade so each subcontractor gets their own, and choose whether to include resolved or archived items. Share it by email, WhatsApp or anything else on your phone. The app keeps working without signal — photos save to the device straight away and upload when you are back online — and everything syncs to the web app, so the office can review the same list in a browser.